LDD-16 · Exterior Lighting Infrastructure

One-line intent

Lighting is infrastructure — not add-on. No future trenching ever required.

Locked decisions

Open items / engineer review

Cost drivers

Underground conduit network (rough-in only): $4–12K. Pull strings + tracer wire $0.3–1K. Stub-outs at fixture locations $50–150 each. Hub junction boxes + transformers $1–4K. Rough-in only: $5–18K. Fixtures + control add $8–25K at install. Complete: $15–40K.

Air-gap concerns

  • Trenches can't undermine PEMB footings. Coordinate with structural before any trench.
  • No landscape design = stubbing toward "approximately." Get even a sketch before rough-in.
  • Solar PV interaction if ground-mounted — hub needs PV-conduit capacity.
  • EV charging stubs at exterior pads for guest parking — trench now if any future plan.
  • Generator location coordination — gas line + conduit run from this hub.

Cross-references

→ Outputs to

LDD-08 same scene system · LDD-09 branch from main