LDD-05 · HVAC System (Overview)

One-line intent

Each zone uses the simplest correct system — no single system serves the entire building.

System breakdown by zone

ZoneSystemNotes
Living wingDucted heat pumpTrunk + 5 branches; details in LDD-06
Gym2 mini-splits + destrat fansAthletic / large-volume strategy
BedroomsDucted heat pump (separate zone)Upper level
UCRRadiant + passive cooling, fan-assistedLowest-velocity comfort
ILSMini-splitsIndependent operation
WorkshopMini-splitIndependent
LOWRough-in Phase 1Active equipment deferred

Constraints

Open items / engineer review

Cost drivers

Living wing ducted $30–55K · Bedroom ducted $22–35K · Gym mini-splits $15–25K · ILS mini-split $7–12K · Workshop mini-split $5–8K · Destrat fans $20–35K · ERV (currently missing) $8–18K · LOW rough-in $3–6K. Total: $115–195K, mid ≈ $155K, budgeted at $175K.

Air-gap concerns

  • Missing ventilation system. Tight envelopes need balanced ventilation (ERV in cold climate). Add now; can't add cleanly after walls close.
  • Gym cooling load not accounted for — west-facing clerestory + 20'+ ceiling = big summer load.
  • Make-up air strategy missing — without it, island vent backdrafts something.
  • No zoning controls / thermostats — multi-system house needs ≥5 stats and zone coordination strategy.
  • Bedroom system trunk path? Named but never sited.

Cross-references

← Inputs from

LDD-02 radiant baseline

→ Outputs to

LDD-06 · LDD-07 · LDD-12

Diagram

Exposed ceiling hierarchy
HVAC trunk + branches occupy layers 2–3 of the exposed ceiling hierarchy.