LOCKED workflow dimensions need reconciliation

LDD-13 · South Bay Layout

One-line intent

Workflow-driven system, not just space allocation — west = production, middle = service, east = parking.

Locked decisions

Layout (rooms overlap with transport spine — not strictly linear)

  1. Equipment room (~10' × 13', tucked into corner, shares wall with mezzanine)
  2. Workshop WC (shares the equipment-room corner)
  3. Workshop main (~23' × 16' work zone with 7' clear transport spine — multi-use thoroughfare, not a dedicated hallway)
  4. Service zone (overlaps workshop transport spine)
  5. Material lift — 6'×7' shaft, 5'×6' platform. Asgard Press inventory transport between ground and LOW; NOT a passenger elevator. Out of passenger-lift codes; falls under industrial material-lift / dumbwaiter classification.
  6. Hybrid receiving / storage bay (Asgard Press operational zone)
  7. 3-car garage bays

Open items / engineer review

Cost drivers (revised — lift reclassified)

  • Material lift (Asgard Press inventory, not passenger): dumbwaiter / industrial material-lift = $5–15K installed. Previously $25–55K passenger class, corrected.
  • 3 garage doors with operators: $12–27K
  • Hybrid bay door: $3–6K
  • Equipment room buildout (mineral wool reused from LDD-11 spec): $3–6K
Total: $25–55K south bay (corrected from $95K — Δ -$40K).

Builder's response (Round 2, accepted)

  • Lift SPOF — withdrawn. Material lift only; failure = inventory stays on ground for a day.
  • Dimensions reconciliation — withdrawn. Rooms are nested/overlapping, not linear; my misreading.
  • South face thermal — withdrawn. Insulated sectional doors + south solar gain (winter) + 4' overhang (summer shading) is correct passive solar logic.
  • Equipment room noise — solved by reusing mineral wool + double-stud already specified for habitable zones; not a separate $4–8K add-on.
  • Workshop / hybrid overlap — confirmed: hybrid east side, transport spine through lift to LOW.

Remaining air-gap concerns (much shorter list)

  • Equipment room: verify mineral-wool spec extends here in construction drawings.
  • Material-lift vendor + maintenance regimen still worth documenting — even residential dumbwaiters have wearing parts (cables, motor).

Cross-references

→ Outputs to

LDD-14 · LDD-09 subpanel · LDD-02 south manifold · LDD-10 south cluster

← Inputs from

LDD-01 south PEMB bay

Diagram

South bay plan from west to east
Equipment · WC · workshop · lift · hybrid · 3 garage bays.